Craft Lifecycle

Every craft in ATC follows a defined lifecycle — a sequence of states from creation to completion (or failure). Understanding the lifecycle is key to understanding how ATC orchestrates changes.

States

StateTerminalDescription
TaxiingNoCraft initialized — branch created, pilots assigned, cargo and flight plan defined
InFlightNoPilots actively implementing, navigating vectors in order
LandingChecklistNoAll vectors passed. Pilot runs validation checks
GoAroundNoLanding checklist failed. Pilot addresses failures before re-attempt
ClearedToLandNoChecklist passed, tower granted clearance. Craft is in merge queue
LandedYesBranch merged into main. Done.
EmergencyNoPilot declared an emergency after repeated failures
ReturnToOriginYesCraft sent back to design stage for re-evaluation. Done.

State Diagram

                    ┌─────────────────────────────────────────┐
│ │
▼ │
┌──────────┐ ┌──────────┐ ┌─────────────────┐ ┌───────────┐
│ Taxiing │──▶│ InFlight │──▶│ LandingChecklist │──▶│ GoAround │
└──────────┘ └──────────┘ └─────────────────┘ └───────────┘
│ ▲ │ │
│ │ │ │
│ └──────────────┘ │
│ (vector passed) ┌──────────────┘
│ │
│ ▼
│ ┌─────────────────┐ ┌──────────────────┐
│ │ Emergency │──▶│ ReturnToOrigin │
│ └─────────────────┘ │ (terminal) │
│ └──────────────────┘


┌───────────────┐ ┌──────────┐
│ ClearedToLand │──▶│ Landed │
└───────────────┘ │(terminal)│
└──────────┘

Transitions

#FromToTriggerPreconditions
1TaxiingInFlightPilot begins implementationCaptain, cargo, and flight plan assigned
2InFlightInFlightPilot passes a vector and reports to ATCNext vector in flight plan sequence
3InFlightLandingChecklistPilot begins validation checksAll vectors passed and reported
4LandingChecklistClearedToLandAll checks pass; tower grants clearanceAll checklist items pass
5LandingChecklistGoAroundOne or more checks failAt least one checklist item failed
6GoAroundLandingChecklistPilot re-attempts after fixing failuresPilot has addressed failure(s)
7GoAroundEmergencyRepeated failures or pilot escalatesCaptain decision
8ClearedToLandLandedTower merges branch into mainBranch up to date with main
9EmergencyReturnToOriginCraft sent back to design with black boxEmergency declaration recorded

Terminal States

Two states are terminal — no transitions out are permitted:

  • Landed: The craft's branch has been merged into main. The change is complete.
  • ReturnToOrigin: The craft has been sent back to the design stage. The origin airport will decide whether to re-plan, re-scope, or abandon.

The Happy Path

The most common lifecycle follows this sequence:

  1. Taxiing — craft is set up with callsign, cargo, pilots, and flight plan
  2. InFlight — pilots implement the change, passing vectors one by one
  3. LandingChecklist — all vectors done, validation checks run
  4. ClearedToLand — everything passes, tower grants clearance
  5. Landed — branch merged, craft complete

The Go-Around Loop

If the landing checklist fails, the craft enters GoAround. The pilot fixes the issues and re-enters LandingChecklist. This loop can repeat multiple times. If the pilot can't resolve the failures after repeated attempts, the captain may escalate to Emergency.

Rules

  • RULE-LIFE-1: A craft must begin in the Taxiing state.
  • RULE-LIFE-2: Only the transitions listed above are valid. Any unlisted transition is illegal.
  • RULE-LIFE-3: Taxiing to InFlight requires a captain, cargo, and flight plan to be assigned.
  • RULE-LIFE-4: InFlight to LandingChecklist requires all vectors to be passed and reported.
  • RULE-LIFE-5: LandingChecklist to ClearedToLand requires all checklist items to pass and the tower to grant clearance.
  • RULE-LIFE-6: ClearedToLand to Landed requires the tower to verify the branch is up to date with main and execute the merge.
  • RULE-LIFE-7: Emergency to ReturnToOrigin requires an EmergencyDeclaration entry in the black box.
  • RULE-LIFE-8: Landed and ReturnToOrigin are terminal states. No transitions out are permitted.